A320 Electrical System

Lesson 9 of 12 — Load Shedding Logic

Estimated time: 20 minutes

Load Shedding Logic

Understanding load shedding is critical for managing electrical emergencies. The A320 uses an automatic load shedding system that prioritizes essential flight systems when power generation capacity is reduced.

A320 Electrical System Diagram showing power distribution and bus configuration

A320 Electrical System — Normal Configuration Diagram

Key Concept

During load shedding, the system follows a priority hierarchy: Flight controls → Navigation → Communication → Lighting → Galley. Non-essential loads are shed first to preserve power for critical systems.

ECAM Warning

When load shedding activates, ECAM displays "ELEC - BUS SHED" on the Engine/Warning Display. Pilots must verify which buses are lost and adjust procedures accordingly.

Load Shedding Priority

PriorityBusSystems PoweredStatus
1 (Essential)AC ESSFD, EFIS, VHF1, ATCAlways Powered
2 (Essential)DC ESSFCU, FMGC1, ClockAlways Powered
3 (Normal)AC 1ENG 1 instruments, Probe heatShed if needed
4 (Normal)AC 2ENG 2 instruments, GalleyFirst to shed